Skip to main content

Concept for restoring and extending the operational life of equipment in Ukraine's most important economic sectors

Call Title: Science for the Reconstruction of Ukraine in the War and Post-War Periods
Project registration number: 2022.01/0038
Project implementation timeline: -
Type of research (development): fundamental scientific research
Branch of science: Mathematical Analysis (01.01.01)

Priority direction of development of science and technology: fundamental scientific research on the most important problems of developing scientific, technical, socio-economic, socio-political, and human potential to ensure Ukraine's competitiveness in the world, sustainable development of society and the state
Scientific direction by competition: technologies and devices for automatic remote recognition and tracking of objects that move and are periodically partially blocked from observation, with the issuance of control signals to actuators for pointing at the object
Departmental subordination of the institution: National Academy of Sciences of Ukraine

Number of doctors of science: 3
Number of candidates of sciences: 6
Number of young scientists: 3
Ratio of leading and young scientists: 44:56
Number of support staff: 3
Average score according to expert assessment: 89.65

Project goal: Development and justification of optimal parameters for resource-saving technology for the extraction and processing of non-metallic mineral raw materials for the production of building materials in the context of Ukraine's sustainable recovery and limited energy supply.
Project results: The project addresses an issue that is extremely important for Ukraine, which arose during the war, and its negative consequences may continue to be felt for a long time in the post-war period, particularly for mining companies, which are the backbone of the construction industry, which supplies building materials that are essential for the restoration of destroyed critical infrastructure and residential and non-residential buildings. As a result of the proposed project, based on research into technologies for the extraction and processing of mineral raw materials, their scientific and practical justification, and technical and technological improvement in conditions of critical energy generation and distribution shortages, an innovative resource-saving technology for the effective development of non-metallic mineral raw material deposits will be developed as promising for implementation.

 

PROJECT PARTICIPANTS

Project Manager: Mordyuk Bohdan
Term in the project: -
H index: 7
ORCID,Scopus, WoS, Google Scholar,

Project Executor: Radchenko Taras
Term in the project: -
Institution: G.V. Kurdyumov Institute of Metal Physics

Project Executor: Gatsenko Alexander
Term in the project: -
Institution: G.V. Kurdyumov Institute of Metal Physics

Project Executor: Naumuk Artem
Term in the project: -
Institution: G.V. Kurdyumov Institute of Metal Physics

Project Executor: Valentin Tatarenko
Term in the project: -
Institution: G.V. Kurdyumov Institute of Metal Physics

Project Executor: Lesyk Dmytro
Term in the project: -
Institution: National Technical University of Ukraine “Igor Sikorsky Kyiv Polytechnic Institute”

 

SCIENTIFIC MATERIALS OF THE PROJECT

Articles Q1 – Q2:
  1. Tolochyna, O., Tolochyn, O., Bagliuk, G. et al. Effect of Heating Rate and Hot Forging Temperature on Phase Formation and Complex Physical and Mechanical Properties of Powdered Iron Aluminide. JOM, 2022.(Q2)  НАЦІОНАЛЬНИЙ ФОНД ДОСЛІДЖЕНЬ УКРАЇНИ https://doi.org/10.1007/s11837-022-05631-3
  2. Oleksandr Myslyvchenko, Roman Litvyn, Larisa Krushynska, Ostap Zgalat-Lozynskyy, Phase transformations of ilmenite ore during microwave treatment at a frequency of 2.45 GHz under the influence of sucrose, Materialia, Volume 22, 2022, (Q1) https://doi.org/10.1016/j.mtla.2022.101417
  3. Zgalat-Lozynskyy, O., Tischenko, N., Shirokov, O. et al. Deformation Treatment in Spark Plasma Sintering Equipment and Properties of AlON-based Ceramic. J. of Materi Eng and Perform 31, 2575–2582, 2022 (Q2) https://doi.org/10.1007/s11665-021-06381-0 
Articles Q3 – Q4:
  1. Zgalat-Lozynskyy, O., Kud, I., Ieremenko, L. et al. Preparation of TiB2-20 Wt Pct MoSi2 Composite Material by Mechanochemical Synthesis and Spark Plasma Sintering. Metall Mater Trans A 52, 2451–2462 (2021)  https://doi.org/10.1007/s11661-021-06235-3 (Q3)
Articles in professional publications in Ukraine:
  1. O. Zgalat-Lozynskyy, V. Varchenko, N. Tischenko, A. Ragulya, M. Andrzejczuk, A. Polotai, Tribological behaviour of Si3N4based nanocomposites, Tribology International, Volume 91, 2015, Pages 85-93,  https://doi.org/10.1016/j.triboint.2015.06.027 
Monographs:
  1. 144932, 2020: METHOD OF FORMING A COATING ON THE SURFACE OF A STEEL PART BY ELECTRICAL SPARK ALLOYING
Patents:
  1. Ukrainian Patent No. 126254 Method for obtaining a composite powder of silicon nitride-zirconium nitride, I.V. Kud, L.I. Eremenko, L.A. Krushynska, D.P. Ziatkevich, O.B. Zgalat-Lozynskyi, N.S. Ziatkevich, 2022 
Study guides:
  1. Modern Technologies of Powder Materials Science, developed within the framework of the doctoral program (third (educational and scientific) level of higher education) for applicants majoring in 132 “Materials Science,” Institute of Materials Science Problems named after I.M. Frantsevich of the National Academy of Sciences of Ukraine (60 hours). http://www.materials.kiev.ua/aspirantura/syllabuses/Mode rn_technol_of_powder_materials_science_132.pdf

 

PROJECT FUNDING

Total project funding First stage Second stage Third stage The fourth stage
2859587.00 934063.00 1925524.00
2859587.00 934063.00 1925524.00
Actual funding First stage Second stage Third stage Fourth stage
2630923.00 870906.00 1760017.00
2630923.00 870906.00 1760017.00
Deviations in project funding First stage Second stage Third stage Fourth stage
228664.00 63157.00 165507.00
228664.00 63157.00 165507.00

 

PROJECT EXPENSES

Amount of unused funds for the project Reason for reducing project funding Project cost structure Direct costs Payment of labor Payroll accruals Equipment Business trip Indirect costs Utility expenses Other expenses Materials Third-party funds
228664.00

Decision of the Scientific Council of the NFDU dated March 1, 2023, Protocol No. 12
Decision of the Scientific Council of the NFDU dated December 22, 2024, Protocol No. 41

2630923.00 2452905.38 1975095.54 434521.02

2023
1. 500 ml ceramic beaker for planetary mill - 180,521.00
2. Digital camera for Levenhuk M1400 PLUS optical microscope - 28,300.00
2024
1. Autonomous cooling system (chiller) for vacuum high-temperature furnace - 151,743.90
2. RV 10 digital V-C rotary evaporator - 29,734.30

32850.00 139006.56 124578.21 33000.00

2023
1. Reagents - 380.00
2. Oxygen - 15,300.00
2024
1. Reagents - 11,743.90
2. Molybdenum powder - 734.30

162987.00